Chat with us, powered by LiveChat

Year: 2018

  • BY Timpani Woodson IN Project Profiles October 17, 2018 COMMENTS(0)

    Clearwing Systems Integration completely updated the lighting system in Dobson High School’s auditorium. The renovation included infrastructure upgrades, a new network system, a new LED theatrical lighting fixture inventory, and LED retrofits.  The outdated ETC Unison architectural control system was swapped out for an ETC Paradigm architectural system, and a new equipment rack was built…

  • BY Timpani Woodson IN Project Profiles September 27, 2018 COMMENTS(0)

    The Al McGuire Center, located on Marquette University’s campus, is home of the intercollegiate administrative offices, student-athlete services, practice and game courts, and numerous other facilities. The center originally opened in 2003 and in August 2017, Clearwing Systems Integration installed a new PA and updated control system.  The new system included 16 QSC AP-5152 –…

  • BY Timpani Woodson IN Project Profiles February 22, 2018 COMMENTS(0)

    Christ’s Church of the Valley opened their eighth Arizona campus in Chandler on Christmas Eve, 2017. Clearwing Systems Integration was hired to complete the audio, video, and lighting installation in the main sanctuary and three student rooms of the space, which formerly housed a charter school. For audio in the main sanctuary, Clearwing hung six…

  • BY Timpani Woodson IN Project Profiles April 1, 2018 COMMENTS(0)

    In April 2017, a fire broke out in UW-Milwaukee’s Peck School of the Arts’ Mainstage Theatre causing significant damage to the theater seats, scene shop, backstage space, and lighting system. Clearwing Systems Integration was contracted to reconstruct the rigging and lighting systems, renewing just a portion of the $5.7 million of damage throughout the building. …

  • BY Timpani Woodson IN Project Profiles February 22, 2018 COMMENTS(0)

    Randy Gallob of Stone and Steel, a Sloan company, tapped Clearwing Systems Integration to bring his vision of a waterless waterfall to life. The environmentally friendly fixture was engineered by Clearwing staff for the lobby of Stone and Steel’s Phoenix office. An ENTTEC Pixelator, PLINK Injectors and ENTTEC ELM software were all used to bring…

locations

  • Clearwing Systems Integration - WI

    Wisconsin 414 258 6333
    11101 W.Mitchell St.
    Milwaukee, WI 53214

  • Clearwing Systems Integration - AZ

    Arizona 602 850 6333
    3011 E. Broadway Rd. Suite 100
    Phoenix, AZ 85040

  • Clearwing Systems Integration - CO

    Colorado 303 232 3540
    610 E 55th Ave, #300
    Denver, Colorado 80216

  • Clearwing Systems Integration - CA

    California 858 345 3633
    3077B Clairemont Drive #126
    San Diego, CA 92117

SEND A MESSAGE

Get A Quote