Month: February 2018

  • BY Timpani Woodson IN Project Profiles February 22, 2018 COMMENTS(0)

    Christ’s Church of the Valley opened their eighth Arizona campus in Chandler on Christmas Eve, 2017. Clearwing Systems Integration was hired to complete the audio, video, and lighting installation in the main sanctuary and three student rooms of the space, which formerly housed a charter school. For audio in the main sanctuary, Clearwing hung six…

  • BY Timpani Woodson IN Project Profiles February 22, 2018 COMMENTS(0)

    Randy Gallob of Stone and Steel, a Sloan company, tapped Clearwing Systems Integration to bring his vision of a waterless waterfall to life. The environmentally friendly fixture was engineered by Clearwing staff for the lobby of Stone and Steel’s Phoenix office. An ENTTEC Pixelator, PLINK Injectors and ENTTEC ELM software were all used to bring…

locations

  • Clearwing Systems Integration - WI

    Wisconsin 414 258 6333
    11101 W.Mitchell St.
    Milwaukee, WI 53214

  • Clearwing Systems Integration - AZ

    Arizona 602 850 6333
    5640 S. 40th Street #1
    Phoenix, AZ 85040

SEND A MESSAGE

Get A Quote