Month: September 2020

  • BY Jay Baumgardner IN Blog, Project Profiles September 17, 2020 Comments Off on Historic West Bend Theatre

    Clearwing recently completed design and installation of a building-wide lighting power and control system as well as rigging and drapery¬†at The Historic West Bend Theatre. The lighting system installation featured dimming and switching, integration of architectural lighting fixtures, emergency lighting transfer, architectural user interfaces and system programming. Equipment (2) ETC Echo Relay Panels (9) ETC…

  • BY Jay Baumgardner IN Blog September 15, 2020 Comments Off on How Streaming Systems Work and Components

    Live streaming systems can be extremely beneficial to any church, school, or other organization. From connecting audiences to generating revenue, the possibilities are endless. We put together a simple walkthrough to give you a general understanding of these systems. Contact Us For Purchase, Installation, and Service.

  • BY Jay Baumgardner IN Blog, Project Profiles September 8, 2020 Comments Off on West Point High School

    The latest high school campus for the Tolleson School District is West Point High School. Clearwing provided and installed audio video, theatrical lighting, rigging, and stage drapery systems for the auditorium. A large drama classroom included a pipe grid built with The Light Source Mega Battens, ETC light fixtures and control and an audio system…