Blog

  • BY Jay Baumgardner IN Blog July 2, 2020 Comments Off on Installed Streaming Solutions For Venues

    Earlier this year, the unthinkable happened. The spread of COVID-19 caused nearly every church, school, theatre, and venue to immediately close its doors. Some prepared and others not – many were forced to immediately begin streaming and broadcasting their services and events. As time goes on we see many asking, “Is our system truly capable…

  • BY Jay Baumgardner IN Blog, Project Profiles June 25, 2020 Comments Off on Waterford Union High School

    Less than a year after partnering with Clearwing Systems Integration to revamp the Audio System in the school’s Auditorium, Waterford Union High School once again chose Clearwing Systems Integration to design and update the auditorium’s Lighting and Rigging systems. Together, Clearwing and the school collaborated in designing and installing systems to provide flexibility for various…

  • BY Jay Baumgardner IN Blog, Project Profiles April 20, 2020 Comments Off on Ark Encounter Answers Center

    PRESS RELEASE / FOR IMMEDIATE RELEASE CLEARWING SYSTEMS INTEGRATION INSTALLS AUDIO, VIDEO, LIGHTING, RIGGING, & DRAPERY SYSTEMS AT ARK ENCOUNTER’S ANSWERS CENTER WILLIAMSTOWN, Kentucky – April 2020 — Home to the life-size replica of Noah’s Ark, the Ark Encounter continues to grow with the construction of the Answers Center. The 2,500-seat multipurpose venue hosts daily…

  • BY Jay Baumgardner IN Blog, Project Profiles March 27, 2020 Comments Off on Sierra Linda High School

    Clearwing Systems Integration completed a new auditorium at Sierra Linda High School for ADM Group, and McCarthy Building. Installation included Audio, Video, Lighting, Motorized Rigging, and Stage Drapery. This is one of two new auditoriums for the growing Tolleson Union High School District. Both boast the latest technology including full LED lighting, ETC motorized rigging,…

  • BY Jay Baumgardner IN Blog, Project Profiles March 26, 2020 Comments Off on Sunnyslope High School

    Sunnyslope High School in the Glendale Union High School District is nationally ranked and sought after by parents.  It is now also the first district school to receive a substantial auditorium overhaul. The theater building is over forty years old and had at least one previous lighting overhaul.  The electrical parts and pieces from the…

  • BY Jay Baumgardner IN Blog, Project Profiles March 25, 2020 Comments Off on CCV Church – Verrado

    CCV Verrado is Christ’s Church of the Valley’s tenth campus in the Phoenix area.  Clearwing Systems Integration designed, provided and installed all production equipment and systems for the main worship room, three kids’ rooms and the lobby. In the main worship, one ultra-wide 30-ft by 12-ft fixed Draper projection screen was chosen with two edge…