Chat with us, powered by LiveChat

Category: Blog

  • BY Timpani Woodson IN Blog, Project Profiles October 28, 2019 COMMENTS(0)

    The Sheboygan Falls School District recently opened the doors to its new middle school. The state-of-the-art facility was built with improved technology, more classrooms, and increased security for fifth through eighth graders. Clearwing Systems Integration worked with the district to design and install innovative solutions for their unique performance configuration. The stage sits in-between the…

  • BY Timpani Woodson IN Blog, Project Profiles October 28, 2019 COMMENTS(0)

    Sheboygan Falls High School partnered with Clearwing Systems Integration to design and install an upgraded audio system in their auditorium where they hold theatrical productions, band and choir concerts, and school events. The auditorium needed a user-friendly solution with upgraded technology that would disperse sound to the back of the house while reducing the need…

  • BY Timpani Woodson IN Blog, Project Profiles September 10, 2019 COMMENTS(0)

    Mount Horeb High School recently went through a multi-million dollar renovation which included new academic classrooms, and a system overhaul in the performing arts auditorium. Mt. Horeb High School partnered with Clearwing Systems Integration to design and install a new audio system in the school’s auditorium. Given the specs of the space, system requirements, and…

  • BY Timpani Woodson IN Blog, Project Profiles September 6, 2019 COMMENTS(0)

    Waterford Union High School was amid an ongoing initiative to improve the school’s function and design. The theater, used to for plays, concerts, recitals, and various other student activities, needed an audio update to accommodate for the various types of events in the venue. Clearwing Systems Integration and the high school partnered together to design…

  • BY Timpani Woodson IN Blog, Project Profiles September 5, 2019 COMMENTS(0)

    The Robert and Marie Hansen Family Fine Arts Theatre in Divine Savior Holy Angels High School was built in 2002 and is the primary location for all school masses and assemblies. In addition, the theatre hosts four annual theatrical productions including the fall musical, winter play, spring Advanced Acting Class production, and summer Community Theatre…

  • BY Timpani Woodson IN Project Profiles April 26, 2019 COMMENTS(0)

    The Al McGuire Center, located on Marquette University’s campus, is home of the intercollegiate administrative offices, student-athlete services, practice and game courts, and numerous other facilities. The center originally opened in 2003 and in August 2017, Clearwing Systems Integration installed a new PA and updated control system. The new system included 16 QSC AP-5152 –…

locations

  • Clearwing Systems Integration - WI

    Wisconsin 414 258 6333
    11101 W.Mitchell St.
    Milwaukee, WI 53214

  • Clearwing Systems Integration - AZ

    Arizona 602 850 6333
    3011 E. Broadway Rd. Suite 100
    Phoenix, AZ 85040

  • Clearwing Systems Integration - CO

    Colorado 303 232 3540
    610 E 55th Ave, #300
    Denver, Colorado 80216

  • Clearwing Systems Integration - CA

    California 858 345 3633
    3077B Clairemont Drive #126
    San Diego, CA 92117

SEND A MESSAGE

Get A Quote