Chat with us, powered by LiveChat

Tag: rigging

  • BY Timpani Woodson IN Project Profiles April 1, 2018 COMMENTS(0)

    In April 2017, a fire broke out in UW-Milwaukee’s Peck School of the Arts’ Mainstage Theatre causing significant damage to the theater seats, scene shop, backstage space, and lighting system. Clearwing Systems Integration was contracted to reconstruct the rigging and lighting systems, renewing just a portion of the $5.7 million of damage throughout the building. …

locations

  • Clearwing Systems Integration - WI

    Wisconsin 414 258 6333
    11101 W.Mitchell St.
    Milwaukee, WI 53214

  • Clearwing Systems Integration - AZ

    Arizona 602 850 6333
    3011 E. Broadway Rd. Suite 100
    Phoenix, AZ 85040

  • Clearwing Systems Integration - CO

    Colorado 303 232 3540
    610 E 55th Ave, #300
    Denver, Colorado 80216

  • Clearwing Systems Integration - CA

    California 858 345 3633
    3077B Clairemont Drive #126
    San Diego, CA 92117

SEND A MESSAGE

Get A Quote