Chat with us, powered by LiveChat

Tag: video installation

  • Home
  • video installation
  • BY Timpani Woodson IN Project Profiles February 22, 2018 COMMENTS(0)

    Randy Gallob of Stone and Steel, a Sloan company, tapped Clearwing Systems Integration to bring his vision of a waterless waterfall to life. The environmentally friendly fixture was engineered by Clearwing staff for the lobby of Stone and Steel’s Phoenix office. An ENTTEC Pixelator, PLINK Injectors and ENTTEC ELM software were all used to bring…

  • BY Mike Jonas IN Blog July 25, 2016 COMMENTS(0)

    By Mike Jonas. Photos by Aaron Wallace. Clearwing Systems Integration provided a complete audio and video package for Ark Encounter, which opened on July 7, 2016 in Williamstown, KY. As the largest timber-frame structure in the world, Ark Encounter features a full-scale Noah’s Ark, spanning 510 feet long, 85 feet wide, and 51 feet high. It’s…

  • BY Laura Eddy IN Blog April 7, 2016 COMMENTS(0)

    The Cathedral of St. John the Evangelist has been the seat of the Catholic Archdiocese of Milwaukee for 150 years, and its outward appearance has changed very little in that time. Listed in the National Register of Historical Places, this Milwaukee landmark was rededicated in 2002 after undergoing a complete restoration to preserve its beauty….

locations

  • Clearwing Systems Integration - WI

    Wisconsin 414 258 6333
    11101 W.Mitchell St.
    Milwaukee, WI 53214

  • Clearwing Systems Integration - AZ

    Arizona 602 850 6333
    5640 S. 40th Street #1
    Phoenix, AZ 85040

  • Clearwing Productions - CO

    Colorado 303 232 3540
    610 E 55th Ave, #300
    Denver, Colorado 80216

SEND A MESSAGE

Get A Quote